BHICO Speeds Up Steel Pile Cutting Using UCS SP-12

BHICO is a leading Utah-based contractor delivering large and complex energy, industrial, and mining projects nationwide. Committed to safety, quality, and on-time delivery, BHICO’s teams faced real challenges with traditional pile cutting methods on large solar field projects.

Challenge

  • Thousands of steel piles needed cutting
  • Torch cutting was risky and created fire hazards
  • Cutting an 8-inch steel pile took 12 to 15 minutes
  • Falling pile sections exposed crews to danger
  • Reliance on third-party cutting teams caused delays

Solution

  • BHICO chose the UCS SP-12 steel pile cutter
  • Fully operated from the excavator cabin by one operator
  • Cuts an 8-inch steel pile in under 2 minutes
  • Lifts and places cut sections safely and precisely

Results

  • Cuts up to 5× faster
  • Enhances jobsite safety
  • Reduces fire risk with blade guard protection
  • Gives full control over schedules and workflows
  • Creates calmer and more predictable jobsites